TPPT009 High Gradient Study at KEK on X-Band Accelerator Structure for Linear Collider 1162
 
  • T. Higo, M. Akemoto, A. Enomoto, S. Fukuda, H. Hayano, N.K. Kudo, S.M. Matsumoto, T. Saeki, N. Terunuma, N. Toge, K.W. Watanabe
    KEK, Ibaraki
  • T.S. Suehara
    University of Tokyo, Tokyo
 
  We have fabricated accelerator structures for linear collider of the warm X-band design. These were composed of high-precision-machined parts for reliable wake-field suppression and possible cheap mass production. The structure design is mostly based on GLC/NLC design in collaboration with SLAC but the fabrication and the high-power test are being performed at KEK to conclude the feasibility, though the application to the present linear collider project was terminated. In this paper are presented the high gradient performance of these structures, such as the initial conditioning characteristics, the stability under high-field operation and various characteristics at high-gradient operation. We conclude that the stability requirement for the linear collider of the warm X-band design is barely satisfied but the preservation of the stability over very long period of more than several years is to be further studied.  
WPAT008 Recent Status of RF Source in J-PARC Linac 1123
 
  • E. Chishiro, T. Hori, H. Suzuki, M. Yamazaki
    JAERI, Ibaraki-ken
  • S. Anami, S. Fukuda, Y. Fukui, M. Kawamura, S. Yamaguchi, M. Yoshida
    KEK, Ibaraki
 
  The construction of the J-PARC (Japan Proton Accelerator Research Complex) linac is under going. RF sources for the low beta linac section use 324-MHz klystrons and after the evaluation of seven prototype tubes, mass production of 20 tubes are conducted. These will be installed in the linac building from April 2005. Performances of the 324-MHz klystrons are described in this paper. The prototype klystron of 972-MHz klystron, which is planed to be installed in high beta linac section, oscillated strongly without any drive rf power, and it had been investigated to solve it. Though it was doubted to be a diode oscillation at first, recent experiment showed the drift-tube oscillation and we succeeded in stopping oscillation by deforming the integrated cavity and detuning. After this experiment, we built a new tube and started to test it. This experiment is written in this paper. Other status of construction related to the rf sources is also shown in this paper.  
WPAT053 Results of a High-Power Klystron Dip Test in the KEK Linac 3235
 
  • K. Nakao, S. Fukuda, H. Katagiri, T. Matsumoto, S. Michizono, T. Takenaka, Y. Yano, M. Yoshida
    KEK, Ibaraki
 
  Dip test, which is the measurement of a klystron heater activity, is recently adopted as the standard measurement to maintain the klystron operation in the KEK electron-positron linac. In 2003, we began to use a dip test as the quick way to measure the emission characteristics from the klystron cathode. After the successful results, we made the dedicated measuring systems and measured the dips of the cathode emission of 60 operating klystrons in KEK electron-positron linac. These data are important to estimate the klystron cathode life and used to select the candidate klystrons of replacement in the summer maintenance period.  
RPPP002 RF Sources of Super-Conducting Test Facility (STF) at KEK 796
 
  • S. Fukuda, H. Hayano
    KEK, Ibaraki
 
  After the ITRP’s technical choice, KEK tried to seek the contribution for the international linear collider and made the plan of super-conducting test facility (STF) in KEK. The STF comprised of phase-I and phase-II; former is the plan for two years from FY2005 and aimed for the quick construction of test facility to evaluate the 4-35MV/m cavity structures and 4-45 MV/m cavity structures with a beam. Phase-II is the next plan of the test facility to extend the several 17m cryomodules. In this paper, general description of the STF is made at first, and rf source plan is shown.