Blackmore, E.W.

Paper Title Page
MPPT014 Design Concept for AGS Injection Kicker Upgrade to 2 GeV 1380
 
  • G.D. Wait, R.B. Armenta, M.J. Barnes, E.W. Blackmore, O. Hadary
    TRIUMF, Vancouver
  • L. Ahrens, C.J. Gardner, W. Zhang
    BNL, Upton, Long Island, New York
 
  Funding: Canada Foundation for Innovation, U.S. Dept of Energy.

The present AGS injection kickers at A5 location were designed for 1.5 GeV proton injection. Recent high intensity runs have pushed the transfer kinetic energy to 1.94 GeV, but with an imperfect matching in transverse phase space. Space charge forces result in both fast and slow beam size growth and beam loss as the size exceeds the AGS aperture. A proposed increase in the AGS injection energy to 2 GeV with adequate kick strength would greatly reduce the beam losses making it possible to increase the intensity from 70 TP (70 * 1012 protons/s) to 100 TP. R&D studies are being undertaken by TRIUMF, in collaboration with BNL, to design two new kicker magnets for the AGS A10 location to provide an additional kick of 1.5 mrad to 2 GeV protons. TRIUMF has proposed a design for a 12.5 W transmission line kicker magnet with rise and fall times of 100 ns, 3% to 97% and field uniformity of ±3% over 90% of the aperture, powered by matched 12.5 W pulse-forming lines. This paper describes the present status of a prototype design including the results of detailed 2D and 3D electromagnetic modeling of a transmission line kicker magnet and PSpice time domain analysis of the magnetic kick strength.

 
RPPE026 Operating Experience with Meson Production Targets at TRIUMF 1919
 
  • E.W. Blackmore, A.S. Dowling, R. Ruegg, M.C. Stenning
    TRIUMF, Vancouver
 
  High power targets are now required for operation at beam powers in excess of 1 MW for spallation neutron sources and neutrino factories. TRIUMF has been operating beryllium and graphite meson production targets for many years. Although the proton beam power of 100 kW at 500 MeV is lower, the beam densities and fluences are higher than most operating solid targets as other accelerators use rotating targets or larger beam spots. The beam size on the TRIUMF targets is maintained at 0.15 cm2 and this beam density leads to proton fluences of 1·1023 protons/cm2 per year. The beryllium targets are rectangular rods immersed in a water-cooled stainless steel jacket. The pyrolytic graphite targets consist of pie-shaped segments bonded to a water-cooled copper saddle. Operating experience shows that the graphite targets suffer thermal damage above beam currents of 120 uA but will operate for long periods at 100 uA. The beryllium targets can operate to 200 uA and appear to survive radiation damage beyond 10 dpa although some targets have failed due to structural damage. This paper will describe the operating experience with these targets and present some thermal and radiation calculations.