A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Bentson, L.D.

Paper Title Page
TPPP032 Proposal for a Multi-Use Test Beam Area in the SLAC B-Line 2221
 
  • P. Emma, L.D. Bentson, R.A. Erickson, H. Fieguth, J. Seeman, A. Seryi
    SLAC, Menlo Park, California
 
  Funding: Work supported by U.S. Department of Energy contract DE-AC02-76SF00515.

With the impending construction of the Linac Coherent Light Source (LCLS) at SLAC, displacing the well-used Final Focus Test Beam (FFTB) area, there is growing interest in developing a new test beam facility, available during LCLS operations and located in the old B-Line tunnel at the end of the linac. The success of the Sub-Picosecond Pulse Source (SPPS) and the desire to preserve this capacity suggests a new beamline with similar or improved electron beam quality, including bunch length compression to 10 microns. Beam availability during LCLS operations requires a new 1.2-km bypass line connecting the 2/3-point of the linac with the B-Line. A second operating mode, with LCLS not in use, involves a trajectory directly from the end of the linac to the B-line. This feature provides the highest beam quality at 30 GeV, and also allows a possible third operational mode by deflecting a few of the very high-brightness 120-Hz, 14-GeV LCLS bunches at low rate (1-10 Hz) into the B-line. Finally, linear collider research can be carried out in a short final focus system at the end of the B-Line, capable of producing a 70-nm rms beam size. We describe a possible design for these systems.

 
TPPT031 Coupler Design for the LCLS Injector S-Band Structures 2176
 
  • Z. Li, L.D. Bentson, J. Chan, D. Dowell, C. Limborg-Deprey, J.F. Schmerge, D.C. Schultz, L. Xiao
    SLAC, Menlo Park, California
 
  Funding: Work supported by the U.S. DOE Contract No. DE-AC03-76SF00515.

The LCLS injector is required to provide a 1-nC, 10-ps bunch with a normalized rms transverse projected emittance of less than 1.0-μm. The LCLS beam is generated and accelerated in a 1.6-cell S-band RF gun to 6-MeV followed by two SLAC 3-m S-band accelerator structures to further accelerate the beam to 135 MeV to move it out of the space-charge dominated regime. In the SLAC S-band structures, the RF power feed is through a single coupling-hole (single-feed coupler) which results in a field asymmetry. The time dependent multipole fields in the coupler induce a transverse kick along the bunch and cause the emittance to increase above the LCLS specification. To meet the stringent emittance requirements for the injector, the single-feed couplers will be replaced by a dual-feed racetrack design to minimize the multipole field effects. We will present detailed studies of the multipole fields in the S-band coupler and the improvements with the dual-feed racktrack design using the parallel finite element eigenmode solver Omega3P.