Paper | Title | Page |
---|---|---|
TOAD003 | Development of the Beam Diagnostics System for the J-PARC Rapid-Cycling Synchrotron | 299 |
|
||
Development of the beam diagnostics system for the J-PARC (Japan Proton Accelerator Research Complex) Rapid-Cycling Synchrotron is described. The system consists of Beam Position Monitor (BPM), Beam Loss Monitor (BLM), Current monitors (DCCT, SCT, MCT, FCT, WCM), Tune meter system, 324MHz-BPM, Profile monitor, and Halo monitor. BPM electrode is electro-static type and its electronics is designed for both COD and turn-by-turn measurements. Five current monitors have different time constants in order to cover wide frequency range. The tune meter is consisted of RFKO and the beam pick-up electrode. For the continuous injected beam monitoring, 324MHz-BPM detects Linac frequency. Two types of profile monitor are multi-wire for low intensity tuning and the residual gas monitor for non-destructive measurement. | ||
RPAT005 | Beam Diagnostics for the J-PARC Main Ring Synchrotron | 958 |
|
||
Beam diagnostics: beam intensity monitors (DCCT, SCT, FCT, WCM), beam position monitors (ESM), beam loss monitors (proportional chamber, air ion chamber), beam profile monitors (secondary electron emission, gas-sheet) have been designed, tested, and will be installed for the Main Ring synchrotron of J-PARC (Japan Proton Accelerator Research Complex). This paper describes the basic design principle and specification of each monitor, with a stress on how to cope with high power beam (average circulation current of ~12 A) and low beam loss operation (less than 1 W/m except a collimator region). Some results of preliminary performance test using present beams and a radiation source will be reported. | ||
FPAE020 | Induction Acceleration of a Single RF Bunch in the KEK PS | 1679 |
|
||
A single bunch trapped in an RF bucket was accelerated by induction devices from 500 MeV to 8GeV beyond transition energy in the KEK-PS. This is the first demonstration of induction acceleration in a high energy circular ring. The acceleration was confirmed by measuring a temporal evolution of the RF phase through an entire acceleration.* Key devices in an induction acceleration system are an induction accelerating cavity capable of generating an induced voltage of 2kV/cell, a pulse modulator to drive the cavity (switching driver), and a DSP system to control gate signals for switching. Their remarkable characteristics are its repetition ratio of about 1MHz and duty factor of 50%. All devices have been newly developed at KEK so as to meet this requirement. The pulse modulator employing MOSFETs as switching elements is connected with the accelerating cavity through a long transmission cable in order to avoid a high-dose irradiation in the accelerator tunnel. The induction system has been running beyond more than 24 hours without any troubles. The paper will take an introductive role for related other 6 papers too, which describe more technical aspects and novel beam physics associated with the induction acceleration.
*K.Takayama et al., submitted to Phys. Rev. Lett., http://www.arxiv.org/pdf/physics/0412006. |