Paper |
Title |
Page |
WOAA008 |
100 Bunch DA NE Operation |
366 |
|
- A. Drago, D. Alesini, G. Benedetti, M. Biagini, C. Biscari, R. Boni, M. Boscolo, A. Clozza, G. Delle Monache, G. Di Pirro, A. Gallo, A. Ghigo, S. Guiducci, F. Marcellini, G. Mazzitelli, C. Milardi, L. Pellegrino, M.A. Preger, P. Raimondi, R. Ricci, C. Sanelli, M. Serio, F. Sgamma, A. Stecchi, A. Stella, C. Vaccarezza, M. Vescovi, M. Zobov (INFN)
|
|
WPAG008 |
Feasibility Study of a 2 GeV Lepton Collider at DAFNE |
2279 |
|
- G. Benedetti, D. Alesini, M. Biagini, C. Biscari, R. Boni, M. Boscolo, A. Clozza, G. Delle Monache, G. Di Pirro, A. Drago, A. Gallo, A. Ghigo, S. Guiducci, M. Incurvati, C. Ligi, F. Marcellini, G. Mazzitelli, C. Milardi, L. Pellegrino, M.A. Preger, P. Raimondi, R. Ricci, C. Sanelli, M. Serio, F. Sgamma, A. Stecchi, A. Stella, C. Vaccarezza, M. Vescovi, M. Zobov (INFN)
|
|
RPAG025 |
Developments in Linear and Non-Linear DAFNE Lattice |
2945 |
|
- C. Milardi, G. Benedetti, M. Biagini, C. Biscari, M. Boscolo, S. Guiducci, M.A. Preger, P. Raimondi, C. Vaccarezza, M. Zobov (INFN)
|
|