Title |
Commissioning of the Phase 2 and Phase 3 SuperKEKB / B-Factory |
Authors |
- S. Nakamura
KEK, Ibaraki, Japan
|
Abstract |
The next generation of B-Factory, the SuperKEKB electron-positron collider at KEK (Japan) has started after two years shutdown from the Phase 1 commissioning in 2016. The first phase for the vacuum scrubbing in 2016 and the second phase focused on the verification of the novel "nano-beam" collision scheme were successfully completed in 2018. The modifications between Phase 1 and Phase 2 follows Phase 3 are installations of the final focus system and the Belle II detector. In order to accomplish the higher luminosity more than the predecessor KEKB , the nano-beam scheme is studied with higher bunch currents to reduce the beam-beam blowup which degrade the luminosity. The new collision scheme is reviewed and the luminosity performance and overall status in the Phase 2 and Phase 3 commissioning are presented.
|
Paper |
download MOYBA2.PDF [0.621 MB / 4 pages] |
Slides |
download MOYBA2_TALK.PDF [13.453 MB] |
Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
Conference |
NAPAC2019 |
Series |
North American Particle Accelerator Conference (4th) |
Location |
Lansing, MI, USA |
Date |
01-06 September 2019 |
Publisher |
JACoW Publishing, Geneva, Switzerland |
Editorial Board |
Yoshishige Yamazaki (MSU, East-Lansing, MI, USA); Tor Raubenheimer (SLAC, Stanford, CA, USA); Amy McCausey (FRIB, East-Lansing, MI, USA); Volker RW Schaa (GSI, Darmstadt, Germany) |
Online ISBN |
978-3-95450-223-3 |
Online ISSN |
2673-7000 |
Received |
30 August 2019 |
Accepted |
01 September 2019 |
Issue Date |
08 October 2019 |
DOI |
doi:10.18429/JACoW-NAPAC2019-MOYBA2 |
Pages |
14-17 |
Copyright |
Published by JACoW Publishing under the terms of the Creative Commons Attribution 3.0 International license. Any further distribution of this work must maintain attribution to the author(s), the published article's title, publisher, and DOI. |
|