WEPOA15 | Installation Progress at the PIP-II Injector Test at Fermilab | 722 |
|
||
Funding: Fermilab is operated by Fermi Research Alliance, LLC under Contract No. De-AC02-07CH11359 with the United States Department of Energy A CW-compatible, pulsed H− superconducting linac 'PIP-II' is being planned to upgrade Fermilab's injection complex. To validate the concept of the front-end of such a machine, a test accelerator (The PIP-II Injector Test, formerly known as "PXIE") is under construction. The warm part of this accelerator comprises a 10 mA DC 30 keV H− ion source, a 2m-long LEBT, a 2.1 MeV CW RFQ, and a 10-m long MEBT that is capable of creating a large variety of bunch structures. The paper will report on the installation of the RFQ and the first sections of the MEBT and related mechanical design considerations. |
||