Author: Piszak, M.
Paper Title Page
TUPYP053 Current Status of Vibration Monitoring System at SOLARIS 111
 
  • M. Piszak
    NSRC SOLARIS, Kraków, Poland
 
  Solaris synchrotron radiation centre, despite being relatively new facility, began expansion of its experimental hall in 2022 in order to accommodate new beamlines. The construction works were carried out along with regular accelerators and beamlines operation and generated high levels of vibration. To better understand the influence of vibrations on electron and x-ray beams¿ stability, an accelerometer-based monitoring system was designed and implemented. The system consists of a triaxial measurement point equipped with seismic accelerometers located on bending magnet inside storage ring and a central signal conditioning and acquisition point. The results of long-term vibration data collection and analysis will be presented along with plans for the future system expansion.  
DOI • reference for this paper ※ doi:10.18429/JACoW-MEDSI2023-TUPYP053  
About • Received ※ 25 October 2023 — Revised ※ 03 November 2023 — Accepted ※ 08 November 2023 — Issued ※ 12 December 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)