WEPPP029 | A Novel Flexible Design of the FaXToR End Station at ALBA | 190 |
|
||
FaXToR is one of the beamlines currently in con-struction and commissioning phase at ALBA, dedicat-ed to fast hard X-ray imaging. It will offer absorption and phase contrast imaging to users. Possible applica-tions of the beamline include 3D static and dynamic inspections in a wide range of applications. FaXToR aims to provide both white and monochromatic beam of maximum 36x14 mm (HxV) at sample position with a photon energy up to 70 keV. The optical layout of the beamline will tune the beam depending on the specific experimental conditions. Among the required optical elements, there is a multilayer monochromator, the cooled slits, the filtering elements, the intensity moni-tor and the beam absorption elements. The end station will be equipped with a rotary sample stage and a de-tector system table to accommodate a dual detection thus simultaneously scanning the samples with high spatial and temporal resolutions. On top of it, a motor-ized auxiliary table dedicated to complex sample envi-ronment or future upgrades will translate along the total table length, independently from the two detector system bridges. The design and construction process of the beamline will be presented. | ||
Poster WEPPP029 [0.851 MB] | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-MEDSI2023-WEPPP029 | |
About • | Received ※ 26 October 2023 — Revised ※ 04 November 2023 — Accepted ※ 08 November 2023 — Issued ※ 10 December 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPPP040 | The Girder System Prototype for ALBA II Storage Ring | 335 |
|
||
The main goal of the upgrade of ALBA Synchrotron Light Facility into ALBA II is the transformation of the current accelerator into a diffraction limited storage ring, which implies the reduction of the emittance by at least a factor of twenty [1]. The upgrade will be executed before the end of the decade and will be profiting at maximum all existing ALBA infrastructures, in particular the building. The whole magnet layout of the lattice [2] has to be supported with a sequence of girders for their positioning with respect to another located in an adjacent girder with an accuracy of 50 µm to ensure the functionality of the accelerator. Besides the girders must enable the remote repositioning the magnets against the overall deformation of the site while ensuring the vibrational stability of the components on top. Easiness of assembling and installation of the different subsystems of the machine on top of the girder has to be considered also as a design requirement, in order to minimize the installation time. Two prototypes are planned to be built next year in order to check its full functionality
[1]ALBA II Accelerator Upgrade Project Status, IPAC¿23 proceedings [2]Progress on the 6BA lattice for ALBAII, IPAC’23 proceedings |
||
Poster THPPP040 [1.710 MB] | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-MEDSI2023-THPPP040 | |
About • | Received ※ 25 October 2023 — Revised ※ 05 November 2023 — Accepted ※ 09 November 2023 — Issued ※ 26 November 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |