Author: Lei, Y.Y.
Paper Title Page
THPPP035 Mechanical System of the U26 Undulator Prototype for SHINE 325
 
  • S.W. Xiang, H.X. Deng, R. Deng, Z.Q. Jiang, Y.Y. Lei, J.Y. Yang, W. Zhang, T.T. Zhen, S.D. Zhou
    SARI-CAS, Pudong, Shanghai, People’s Republic of China
 
  The Shanghai High repetition rate XFEL and Extreme light facility (SHINE) is under construction and aims at generating X-rays between 0.4 and 25 keV with three FEL beamlines at repetition rates of up to 1 MHz[1-3]. The three undulator lines of the SHINE are referred to as the FEL-I, FEL-II, and FEL-III. Shanghai Synchrotron Radiation Facility(SSRF) will manufacture a total of 42 undulators (U26) with a period length of 26mm for FEL-I and 22 undulators (U55) with a period length of 55mm for FEL-II. Both the U26 and U55 are 4m long and use a common mechanical system. By using the specially designed double lever compensation springs can eliminate different magnetic force on the drive units. A U26 prototype has been developed and tested at SSRF. This paper describes the mechanical system design¿simulation and testing results of the U26 prototype, as well as its compatibility with U55.  
DOI • reference for this paper ※ doi:10.18429/JACoW-MEDSI2023-THPPP035  
About • Received ※ 25 October 2023 — Revised ※ 07 November 2023 — Accepted ※ 08 November 2023 — Issued ※ 11 December 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)