Paper |
Title |
Page |
TUOAM02 |
Update of the BM18 ESRF Beamline Development: Presentation of Selected Equipment and Their Commissioning |
1 |
|
- F. Cianciosi, A.-L. Buisson, P. Carceller, P. Tafforeau, P. Van Vaerenbergh
ESRF, Grenoble, France
|
|
|
This article highlights specific equipment that have not yet been described in previous publications, notably the in-vacuum cooled fast shutter for high-energy, the wide aluminium window and tailored high-precision slits (400x200 mm opening). 2022 and 2023 have seen the installation and commissioning of these new equipment. The ID18 beamline opened for user applications in September 2022 with limited capabilities and has been increasing its possibilities since then. It is expected to be fully equipped by the end of 2024.
|
|
|
Slides TUOAM02 [187.155 MB]
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-MEDSI2023-TUOAM02
|
|
About • |
Received ※ 25 October 2023 — Revised ※ 03 November 2023 — Accepted ※ 09 November 2023 — Issued ※ 08 July 2024 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|