JACoW logo

Journals of Accelerator Conferences Website (JACoW)

JACoW is a publisher in Geneva, Switzerland that publishes the proceedings of accelerator conferences held around the world by an international collaboration of editors.


BiBTeX citation export for FROAM01: Design and Testing of HEPS Storage Ring Magnet Support System

@inproceedings{wang:medsi2023-froam01,
  author       = {Z.H. Wang and S.Y. Chen and C.H. Li and M.X. Li and H. Wang and L. Wu and Y.D. Xu and S. Yang and N.C. Zhou},
% author       = {Z.H. Wang and S.Y. Chen and C.H. Li and M.X. Li and H. Wang and L. Wu and others},
% author       = {Z.H. Wang and others},
  title        = {{Design and Testing of HEPS Storage Ring Magnet Support System}},
% booktitle    = {Proc. MEDSI'23},
  booktitle    = {Proc. 12th Int. Conf. Mech. Eng. Design Synchrotron Radiat. Equip. Instrum. (MEDSI'23)},
  eventdate    = {2023-11-06/2023-11-10},
  pages        = {358--362},
  paper        = {FROAM01},
  language     = {english},
  keywords     = {simulation, alignment, storage-ring, experiment, sextupole},
  venue        = {Beijing, China},
  series       = {International Conference on Mechanical Engineering Design of Synchrotron Radiation Equipment and Instrumentation},
  number       = {12},
  publisher    = {JACoW Publishing, Geneva, Switzerland},
  month        = {07},
  year         = {2024},
  issn         = {2673-5520},
  isbn         = {978-3-95450-250-9},
  doi          = {10.18429/JACoW-MEDSI2023-FROAM01},
  url          = {https://jacow.org/medsi2023/papers/froam01.pdf},
  abstract     = {{Very low emittance of High Energy Photon Source (HEPS) demands high stability and adjusting performance of the magnet support. The alignment error between girders should be less than 50 ¿m. Based on that, the adjusting resolution of the girder are required to be less than 5 ¿m in both transverse and vertical directions. Besides, the natural frequency of magnet support system should be higher than 54 Hz to avoid the amplification of ground vibrations. To fulfill the requirements, during the development of the prototype, the structure was designed through topology optimization, static analysis, grouting experiments, dynamic stiffness test and modal analysis, and the rationality of the structure was verified through prototype experiments. During the tunnel installation, the performance of the magnet support system was again verified to be better than the design requirements through test work after installation.}},
}