Zhencheng Mu (Institute of High Energy Physics)
MOPB028
C-band RF system for the SAPS test bench
98
This work describes a C-band RF system for the SAPS (Southern Advanced Photon Source of China) test bench linear accelerator.SAPS' RF testing system comprises of a photocathode electron gun and a 2-metre-long equal gradient acceleration device.The klystron power source delivers energy to the photocathode electron gun and the travelling wave acceleration structure,respectively.Test the photocathode electron gun first,followed by the travelling wave acceleration structure.We investigated a short-pulse C-band spherical pulse compressor.The photocathode electron gun's preliminary high-power testing is now complete.
Paper: MOPB028
DOI: reference for this paper: 10.18429/JACoW-LINAC2024-MOPB028
About: Received: 18 Aug 2024 — Revised: 29 Aug 2024 — Accepted: 29 Aug 2024 — Issue date: 23 Oct 2024
THPB032
The 648 MHz klystron power source system of CSNS-II Linac superconducting ellipsoid cavity
699
The CSNS-II superconducting Linac accelerator includes 20 sets of 324 MHz superconducting spoke cavities and 24 sets of 648 MHz superconducting Ellipsoidal cavities. The beam energy at the end of the superconducting Linac accelerator reaches 300 MeV. The 324 MHz solid-state power source supplies RF power to superconducting Spoke cavity, while the 648 MHz klystron power source supplies RF power to superconducting Ellipsoid cavity. The RF pulse width of the 648 MHz klystron is 1.2 ms, the repetitive frequency is 50 Hz, and the peak power is 800 kW. The 1.5 ms long pulse solid-state modulator provides high voltage pulse for the klystron, and each modulator is equipped with four klystrons.
Paper: THPB032
DOI: reference for this paper: 10.18429/JACoW-LINAC2024-THPB032
About: Received: 20 Aug 2024 — Revised: 01 Sep 2024 — Accepted: 06 Sep 2024 — Issue date: 23 Oct 2024