MO1A —  Welcome & Opening Session   (26-Sep-16   08:30—10:30)
Chair: R. Garoby, ESS, Lund, Sweden
Paper Title Page
MO1A01 The FRIB Superconducting Linac - Status and Plans 1
 
  • J. Wei, H. Ao, S. Beher, N.K. Bultman, F. Casagrande, C. Compton, L.R. Dalesio, K.D. Davidson, A. Facco, F. Feyzi, V. Ganni, A. Ganshyn, P.E. Gibson, T. Glasmacher, W. Hartung, L. Hodges, L.T. Hoff, H.-C. Hseuh, A. Hussain, M. Ikegami, S. Jones, K. Kranz, R.E. Laxdal, S.M. Lidia, G. Machicoane, F. Marti, S.J. Miller, D.G. Morris, A.C. Morton, J.A. Nolen, P.N. Ostroumov, J.T. Popielarski, L. Popielarski, G. Pozdeyev, T. Russo, K. Saito, G. Shen, S. Stanley, H. Tatsumoto, T. Xu, Y. Yamazaki
    FRIB, East Lansing, USA
  • K. Dixon, M. Wiseman
    JLab, Newport News, Virginia, USA
  • A. Facco
    INFN/LNL, Legnaro (PD), Italy
  • K. Hosoyama
    KEK, Ibaraki, Japan
  • H.-C. Hseuh
    BNL, Upton, Long Island, New York, USA
  • M.P. Kelly, J.A. Nolen
    ANL, Argonne, Illinois, USA
  • R.E. Laxdal
    TRIUMF, Vancouver, Canada
 
  With an average beam power two orders of magnitude higher than operating heavy-ion facilities, the Facility for Rare Isotope Beams (FRIB) stands at the power frontier of the accelerator family. This report summarizes the current design and construction status as well as plans for commissioning, operations and upgrades.
Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661 and the National Science Foundation under Cooperative Agreement PHY-1102511.
 
slides icon Slides MO1A01 [48.813 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-MO1A01  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MO1A02 Status of the European XFEL 7
 
  • H. Weise
    DESY, Hamburg, Germany
 
  Funding: Work supported by the respective funding agencies of the contributing institutes; for details please see http:www.xfel.eu
The European XFEL under construction in Hamburg, Northern Germany, aims at producing X-rays in the range from 260 eV up to 24 keV out of three undulators that can be operated simultaneously with up to 27,000 pulses per second. The FEL is driven by a 17.5 GeV superconducting linac. Installation of this linac is now finished and commissioning is next. First lasing is expected for spring 2017. The paper summarizes the status of the project. First results of the injector commissioning are given.
 
slides icon Slides MO1A02 [28.909 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-MO1A02  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)