DOI | Title |
---|---|
https://doi.org/10.18429/JACoW-LINAC2016-MOOP01 | The SARAF-LINAC Project Status |
https://doi.org/10.18429/JACoW-LINAC2016-MOPLR050 | Study and Development of CW Room Temperature Rebuncher for SARAF Accelerator |
https://doi.org/10.18429/JACoW-LINAC2016-WE1A06 | Status of SPIRAL2 and RFQ Beam Commissioning |
https://doi.org/10.18429/JACoW-LINAC2016-THPLR024 | SPIRAL2 Project: Integration of the Accelerator Processes, Construction of the Buildings and Process Connections |