Paper | Title | Page |
---|---|---|
THPLR065 | Beam Commissioning Status and Results of the FNAL PIP2IT Linear Accelerator RFQ | 1002 |
|
||
Funding: Operated by Fermi Research Alliance, LLC under Contract No. De-AC02-07CH11359 with the United States Department of Energy. An H− beam was accelerated through a continuous wave (CW) capable, 4-vane, radio frequency quadrupole (RFQ) at Fermilab that was designed and constructed at Berkeley Lab. This RFQ is designed to accelerate up to 10 mA H− beam from 30 keV to 2.1 MeV in a test accelerator (PIP2IT). This paper presents results of specification verification and commissioning. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-THPLR065 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |