Author: Takasaki, E.
Paper Title Page
THOP08 Beam Commissioning of the i-BNCT Linac 760
THPLR056   use link to see paper's listing under its alternate paper code  
 
  • F. Naito, S. Anami, Z. Fang, K. Futatsukawa, Y. Honda, Y. Hori, M. Kawamura, H. Kobayashi, T. Kurihara, T. Miura, T. Miura, T. Miyajima, T. Obina, F. Qiu, Y. Sato, T. Shibata, M. Shimamoto, A. Takagi, E. Takasaki, M. Uota
    KEK, Ibaraki, Japan
  • S. Fujikura
    ICEPP, Tokyo, Japan
  • K. Ikegami
    J-PARC, KEK & JAEA, Ibaraki-ken, Japan
  • H. Kumada, Su. Tanaka
    Tsukuba University, Graduate School of Comprehensive Human Sciences, Ibaraki, Japan
  • Y. Liu, T. Maruta
    KEK/JAEA, Ibaraki-Ken, Japan
  • A. Miura
    JAEA/J-PARC, Tokai-mura, Japan
  • N. Nagura, T. Ohba
    Nippon Advanced Technology Co., Ltd., Tokai, Japan
  • T. Onishi
    Tsukuba University, Ibaraki, Japan
  • T. Ouchi
    ATOX, Ibaraki, Japan
 
  The beam commissioning of the linac for the boron neutron capture therapy of Ibaraki prefecture (i-BNCT) has been started. The accelerator of i-BNCT consists of the 3-MeV RFQ and 8-MeV DTL. The design of RF structure of them is based on the J-PARC linac. After the first demonstration of neutron production on December 2015, significant modifications to the linac were given in order to increase the operation stability and the beam power. The progress of the beam commissioning of the i-BNCT will be presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-THOP08  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)