Paper | Title | Page |
---|---|---|
TUPRC005 | Source and LEBT Beam Preparation for IFMIF-EVEDA RFQ | 420 |
|
||
The commissioning phase of the IFMIF-EVEDA RFQ requires a complete beam characterization with simula-tions and measurements of the beam input from the IFMIF-EVEDA ion source and LEBT, in order to reach the RFQ input beam parameters. In this article, the simula-tions results of the complex source-LEBT with the corre-sponding set of measurements and their impact on the commissioning plan will be reported. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-TUPRC005 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |