Author: Steinhorst, M.
Paper Title Page
MOPLR014 Construction of a Third Recirculation for the S-DALINAC* 168
 
  • M. Arnold, T. Kürzeder, J. Pforr, N. Pietralla, M. Steinhorst
    TU Darmstadt, Darmstadt, Germany
  • F. Hug
    IKP, Mainz, Germany
 
  Funding: * Work supported by DFG through CRC 634 and RTG 2128
Since 1991 the superconducting recirculating electron accelerator S-DALINAC is running at TU Darmstadt. Its designated design energy of 130 MeV wasn't reached yet due to a lower quality factor of the 3 GHz cavities and thus a higher dissipated power to the helium bath. To increase the maximum achievable energy in cw operation from approx. 85 MeV to the design value of 130 MeV the main accelerator will be passed a fourth time. In this configuration the accelerating gradients of the cavities can be lowered, so that the resulting dissipated power will match the available cooling power of the cryo plant. To realize an additional main linac pass a new recirculation beam line is needed. The most crucial points are the design of the separation dipole and its mirrored version as well as a properly calculated lattice. For the implementation of a new recirculation beam line the existing sections must be adapted to fit the new boundary conditions. This contribution will present some aspects of the design and will report on the actual status of this project.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-MOPLR014  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)