Author: Song, Y.G.
Paper Title Page
MOPLR061 Commissioning of the RI Production Beam Line of KOMAC 271
 
  • H.-J. Kwon, Y.-S. Cho, H.S. Kim, Y.G. Song, S.P. Yun
    Korea Atomic Energy Research Institute (KAERI), Gyeongbuk, Republic of Korea
 
  Funding: This work was supported by the Ministry of Science, ICT & Future Planning of the Korean Government.
A radioisotope (RI) production beam line has been developed at Korea Multi-purpose Accelerator Complex (KOMAC) in 2015 and the commissioning started in 2016. The beam parameters of the beam line are 100-MeV beam energy with a maximum 30 kW beam power, which is driven by KOMAC 100-MeV proton linac. The main components of the beam line are a beam transport system, a target transport system, a cooling system for target and hot cell. KOMAC has a plan to commission the beam line and get an operational license in 2016 and start user service in 2017. In this paper, the development and initial commissioning results of the RI production beam line are presented.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-MOPLR061  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)