TUPLR046 Design, Fabrication, Installation and Operation of New 201 MHz RF Systems at LANSCE 564
 
  • J.T.M. Lyles, W.C. Barkley, R.E. Bratton, M.S. Prokop, D. Rees
    LANL, Los Alamos, New Mexico, USA
 
  Funding: Work supported by the United States Department of Energy, National Nuclear Security Agency, under contract DE-AC52-06NA25396.
The LANSCE RM project has restored the proton linac to high power capability after the RF power tube manufacturer could no longer provide devices that consistently met the high average power requirement. Diacrodes® now supply RF power to three of the four DTL tanks. These tetrodes reuse the existing infrastructure including water-cooling systems, coaxial transmission lines, high voltage power supplies and capacitor banks. Each final power amplifier system uses a combined pair of LANL-designed cavity amplifiers using the TH628L Diacrode® to produce up to 3.5 MW peak and 420 kW of mean power. A new intermediate power amplifier was developed using a TH781 tetrode. These amplifiers are the first production of new high power 200 MHz RF sources at accelerators in three decades. Design and prototype testing of the high power stages was completed in 2012, with commercialization following in 2013. Each installation was accomplished during a 4 to 5 month beam outage each year staring in 2014. Simultaneously, a new digital low-level RF control system was designed and tested, and placed into operation this year, meeting the stringent field control requirements for the linac. The rapid-paced installation project changed over from old to new RF systems while minimizing beam downtime to the user facility schedule.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-TUPLR046  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)