THPLR024 SPIRAL2 Project: Integration of the Accelerator Processes, Construction of the Buildings and Process Connections 894
 
  • P. Anger, P. Bisson, O. Danna, X. Hulin, J.-M. Lagniel, S. Montaigne, F. Perocheau, E. Petit, L. Roupsard
    GANIL, Caen, France
 
  The GANIL SPIRAL 2 Project is based on the construction of a superconducting ion CW LINAC (up to 5 mA - 40 MeV deuteron and 33 MeV proton beams, up to 1 mA - 14.5 MeV/u heavy ion beams) with two experimental areas named S3 ('Super Separator Spectrometer' for very heavy and super heavy element production) and NFS ('Neutron For Science'), The building studies as well as the accelerator and experimental equipment integration started in 2009. The ground breaking started at the end of 2010. The integration task of the different equipments into the buildings is managed by a trade-oriented integration unit gathering the accelerator integration team, the building prime contractor and a dedicated contracting assistant. All work packages are synthesized at the same time using 3D models. 3D tools are used to carry out integration, synthesis, process connections and the preparation of the future assembly. Since 2014, the buildings and process connections are received and the accelerator installation is well advanced. This contribution will describe these 3D tools, the building construction, the process connection status and our experience feedback.  
poster icon Poster THPLR024 [3.620 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-THPLR024  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)