Author: Nelson, R.M.
Paper Title Page
MOOP11 Operation of the CEBAF 100 MV Cryomodules 65
MOPLR003   use link to see paper's listing under its alternate paper code  
 
  • C. Hovater, T.L. Allison, R. Bachimanchi, G.H. Biallas, E. Daly, M.A. Drury, A. Freyberger, R.L. Geng, G.E. Lahti, R.A. Legg, C.I. Mounts, R.M. Nelson, T. E. Plawski, T. Powers
    JLab, Newport News, Virginia, USA
 
  Funding: Authored by JSA, LLC under U.S. DOE Contract DE-AC05- 06OR23177.
The Continuous Electron Beam Accelerator Facility (CEBAF) 12 GeV upgrade reached its design energy in December of 2015. Since then CEBAF has been delivering 12 GeV beam to experimental Hall D and 11 GeV to experimental halls A and B in support of Nuclear physics. To meet this energy goal, ten new 100 MV cryomodules (80 cavities) and RF systems were installed in 2013. The superconducting RF cavities are designed to operate CW at a average accelerating gradient of 19.2 MV/m. To support the higher gradients and higher QL (3.2×107) operations, the RF system uses 13 kW klystrons and digital LLRF to power and control each cavity. This paper reports on the C100 operation and optimization improvements of the RF system and cryomodules.
 
slides icon Slides MOOP11 [1.574 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-MOOP11  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)