Paper | Title | Page |
---|---|---|
MOPLR022 | Commissioning and First Results from the Fermilab Cryomodule Test Stand | 185 |
|
||
Funding: Operated by Fermi Research Alliance, LLC under Contract No. De-AC02-07CH11359 with the United States Department of Energy. A new test stand dedicated to SRF cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overview of first test results, and survey future plans. |
||
![]() |
Poster MOPLR022 [3.431 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-MOPLR022 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |