MOPLR022 Commissioning and First Results from the Fermilab Cryomodule Test Stand 185
 
  • E.R. Harms, M.H. Awida, C.M. Baffes, K. Carlson, S.K. Chandrasekaran, B.E. Chase, E. Cullerton, J.P. Edelen, J. Einstein, C.M. Ginsburg, A. Grassellino, B.J. Hansen, J.P. Holzbauer, S. Kazakov, T.N. Khabiboulline, M.J. Kucera, J.R. Leibfritz, A. Lunin, D. McDowell, M.W. McGee, D.J. Nicklaus, D.F. Orris, J.P. Ozelis, J.F. Patrick, T.B. Petersen, Y.M. Pischalnikov, P.S. Prieto, O.V. Prokofiev, J. Reid, W. Schappert, D.A. Sergatskov, N. Solyak, R.P. Stanek, D. Sun, M.J. White, C. Worel, G. Wu
    Fermilab, Batavia, Illinois, USA
 
  Funding: Operated by Fermi Research Alliance, LLC under Contract No. De-AC02-07CH11359 with the United States Department of Energy.
A new test stand dedicated to SRF cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overview of first test results, and survey future plans.
 
poster icon Poster MOPLR022 [3.431 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-MOPLR022  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPLR056 Results of Operation of 162.5 MHz RFQ Couplers 584
 
  • S. Kazakov, J.P. Edelen, T.N. Khabiboulline, O.V. Pronitchev, J. Steimel
    Fermilab, Batavia, Illinois, USA
 
  Two couplers for RFQ of PXEI facility were designed and manufactured. Each coupler designed to deliver 50 KW, CW to RFQ at 162.5 MHz. Results of couplers operation are reported.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-TUPLR056  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPLR041 650 MHz Elliptical Superconducting RF Cavities for PIP-II Project 943
 
  • I.V. Gonin, E. Borissov, A. Grassellino, C.J. Grimm, V. Jain, S. Kazakov, V.A. Lebedev, A. Lunin, C.S. Mishra, D.V. Mitchell, T.H. Nicol, Y.M. Pischalnikov, G.V. Romanov, A.M. Rowe, N.K. Sharma, N. Solyak, V.P. Yakovlev
    Fermilab, Batavia, Illinois, USA
 
  The PIP-II 800 MeV linac employs 650 MHz elliptical 5-cell CW-capable cavities to accelerate up to 2 mA peak beam current of H in the energy range 185 - 800 MeV. The low beta (LB) βG = 0.61 portion should accelerate from 185 MeV-500 MeV using 33 LB dressed cavities in 11 cryomodules. The high beta (HB) βG = 0.92 portion of the linac should accelerate from 500 to 800 MeV using 24 HB dressed cavities in 4 cryomodules. The development of both LB and HB cavities is going on under IIFC collaboration. The development of LB cavity initiated at VECC Kolkatta and HB cavity is going at RRCAT, Indore. This paper present design methodology adopted starting from RF design to get mechanical dimensions of the RF cells and then explains dressing of the cavity for both low beta and high beta cavities. Further the tuner design and its integration to the dressed cavity is discussed. Paper also explains the salient design features of these dressed cavities.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-THPLR041  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)