Paper | Title | Page |
---|---|---|
MO2A03 | Commissioning and Early Operation of the ARIEL e-Linac | 12 |
|
||
The ARIEL electron linac has been added to the TRIUMF facility as a new driver for the production of radioactive isotopes through photo-fission to complement the existing 500 MeV, H- TRIUMF cyclotron. The electron beam driver is specified as a 50 MeV, 10 mA cw superconducting electron linac at 1.3 GHz. The first 30 MeV stage of the e-linac consisting of two cryomodules is completed. The paper will describe the recent commissioning and early operation results. | ||
![]() |
Slides MO2A03 [25.277 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-MO2A03 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |