MOPLR062 European Spallation Source (ESS) Normal Conducting Front End Status Report 274
 
  • W. Wittmer, P.O. Gustavsson, F. Hellström, G. Hulla
    ESS, Lund, Sweden
  • I. Bustinduy, P.J. González, G. Harper, S. Varnasseri, C. de la Cruz
    ESS Bilbao, Zamudio, Spain
  • L. Celona, S. Gammino, L. Neri
    INFN/LNS, Catania, Italy
  • A.C. Chauveau, D. Chirpaz-Cerbat
    CEA/IRFU, Gif-sur-Yvette, France
  • F. Grespan, A. Pisent
    INFN/LNL, Legnaro (PD), Italy
  • P. Mereu
    INFN-Torino, Torino, Italy
  • O. Midttun
    University of Bergen, Bergen, Norway
  • O. Piquet, B. Pottin
    CEA/DSM/IRFU, France
 
  The European Spallation Source (ESS) will deliver first protons on target by mid 2019. Civil construction of the accelerator tunnel has made good progress and will allow starting installation of the normal conducting frond end (NCFE) by end of 2017. To achieve these milestones the design of all major beam line components have been completed and the construction of the subsystems begun. We report on the advancement of the subsystems and the commissioning progress of the microwave discharge Proton Source (PS-ESS).  
poster icon Poster MOPLR062 [1.396 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-MOPLR062  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)