Author: Fagotti, E.
Paper Title Page
TUPRC005 Source and LEBT Beam Preparation for IFMIF-EVEDA RFQ 420
 
  • L. Bellan, M. Comunian, E. Fagotti, F. Grespan, A. Pisent
    INFN/LNL, Legnaro (PD), Italy
  • P.-Y. Beauvais, B. Bolzon, N. Chauvin
    CEA/DSM/IRFU, France
  • L. Bellan
    Univ. degli Studi di Padova, Padova, Italy
  • P. Cara
    Fusion for Energy, Garching, Germany
  • H. Dzitko
    F4E, Germany
  • R. Gobin, F. Senée
    CEA/DRF/IRFU, Gif-sur-Yvette, France
  • R. Ichimiya, A. Kasugai, M. Sugimoto
    JAEA, Rokkasho, Japan
  • A. Marqueta, F. Scantamburlo
    IFMIF/EVEDA, Rokkasho, Japan
 
  The commissioning phase of the IFMIF-EVEDA RFQ requires a complete beam characterization with simula-tions and measurements of the beam input from the IFMIF-EVEDA ion source and LEBT, in order to reach the RFQ input beam parameters. In this article, the simula-tions results of the complex source-LEBT with the corre-sponding set of measurements and their impact on the commissioning plan will be reported.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-TUPRC005  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPLR051 High-Power RF Test of IFMIF-EVEDA RFQ at INFN-LNL 975
 
  • E. Fagotti, L. Antoniazzi, M.G. Giacchini, F. Grespan, M. Montis, A. Palmieri
    INFN/LNL, Legnaro (PD), Italy
 
  A partial test at full power and CW duty cycle will be performed at INFN-LNL on the last elements of the IFMIF RFQ, approximately two meters of structure, using a specific electromagnetic boundary element on the low energy end. The aim is to reach, in the RFQ coupled with its power coupler system, after an adequate period of conditioning, cw operation at nominal field level (132 kV between electrodes) for at least two hours without breakdown. The description of the experimental setup and procedure, as well as the main results of the conditioning procedure will be reported in this paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-THPLR051  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPLR066 Preparation and Installation of IFMIF-EVEDA RFQ at Rokkasho Site 1005
 
  • E. Fagotti, L. Antoniazzi, A. Baldo, A. Battistello, P. Bottin, L. Ferrari, M.G. Giacchini, F. Grespan, M. Montis, A. Pisent, D. Scarpa
    INFN/LNL, Legnaro (PD), Italy
  • D. Agguiaro, A.G. Colombo, A. Pepato, L. Ramina
    INFN- Sez. di Padova, Padova, Italy
  • F. Borotto Dalla Vecchia, G. Dughera, G. Giraudo, E.A. Macri, P. Mereu, R. Panero
    INFN-Torino, Torino, Italy
 
  The IFMIF-EVEDA RFQ is composed of 18 modules for a total length of 9.8 m and is designed to accelerate the 125 mA D+ beam up to 5 MeV at the frequency of 175 MHz. The RFQ is subdivided into three Super-Modules of six modules each. The Super-Modules were pre-assembled, aligned and vacuum tested at INFN-LNL and then shipped to Rokkasho (Japan). At Rokkasho site a series of test were performed in order to verify the effect of the shipment on the cavity. The assembly debug, shipment equipment and the sequence of operations are described in this paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-THPLR066  