Author: Davidsaver, M.A.
Paper Title Page
MOPRC015 Development Status of FRIB On-line Model Based Beam Commissioning Application 100
 
  • Z.Q. He, M.A. Davidsaver, K. Fukushima, D.G. Maxwell, G. Shen, Y. Zhang, Q. Zhao
    FRIB, East Lansing, Michigan, USA
 
  Funding: The work is supported by the U.S. National Science Foundation under Grant No. PHY-11-02511, and the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661.
The new software FLAME has been developed to serve as physics model used for on-line beam commissioning applications. FLAME is specially designed to cover FRIB modeling challenges to balance between speed and precision. Several on-line beam commissioning applications have been prototyped based on FLAME and tested on the physics application prototyping environment. In this paper, components of the physics application prototyping environment are firstly described. Then, the design strategy and result of the four major applications: baseline generator, cavity tuning, orbit correction, transverse matching, are discussed.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-MOPRC015  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPLR020 Status and Progress of FRIB High Level Controls 885
 
  • G. Shen, E.T. Berryman, D. Chabot, M.A. Davidsaver, K. Fukushima, Z.Q. He, M. Ikegami, M.G. Konrad, D. Liu, D.G. Maxwell, V. Vuppala
    FRIB, East Lansing, USA
 
  Funding: Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661
FRIB, which is a new heavy ion accelerator facility to provide intense beams of rare isotopes, is currently under construction at Michigan State University. Its driver linac accelerates all stable ions up to uranium, and targets to provides a CW beam with the energy of 200 MeV/u and the beam power of 400 kW. The beam commissioning of the its Front-End has been planned to start from Middle of 2016. The high level controls for incoming commissioning is under active development and deployment. The latest status progress will be presented in this paper.
 
poster icon Poster THPLR020 [2.291 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-THPLR020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)