THPLR027 Progress Towards a 2.0 K Half-Wave Resonator Cryomodule for Fermilab's PIP-II Project 906
 
  • Z.A. Conway, A. Barcikowski, G.L. Cherry, R.L. Fischer, B.M. Guilfoyle, C.S. Hopper, M. Kedzie, M.P. Kelly, S.H. Kim, S.W.T. MacDonald, P.N. Ostroumov, T. Reid
    ANL, Argonne, Illinois, USA
  • V.A. Lebedev, A. Lunin
    Fermilab, Batavia, Illinois, USA
 
  Funding: This material is supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics and Office of High-Energy Physics, Contracts No. DE-AC02-76-CH03000 and DE-AC02-06CH11357.
In support of Fermilab's Proton Improvement Plan-II project Argonne National Laboratory is constructing a superconducting half-wave resonator cryomodule. This cryomodule is designed to operate at 2.0 K, a first for low-velocity ion accelerators, and will accelerate ≥1 mA proton/H beams from 2.1 to 10.3 MeV. Since 2014 the construction of 9 162.5 MHz b = 0.112 superconducting half-wave resonators, the vacuum vessel and the majority of the cryomodule subsystems have been finished. Here we will update on the status of this work and report on preliminary cavity test results. This will include cavity performance measurements where we found residual resistances of < 3 nanoOhms at low fields and peak voltage gains of 5.9 MV, which corresponds to peak surface fields of 134 MV/m and 144 mT electric and magnetic respectively.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-THPLR027  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
FR1A02 Installation and On-Line Commissioning of EBIS at ATLAS 1022
 
  • P.N. Ostroumov, A. Barcikowski, J.A. Clark, C. Dickerson, M.R. Hendricks, Y. Luo, R.C. Pardo, C.E. Peters, M.A. Power, G. Savard, S.I. Sharamentov, R.C. Vondrasek, G.P. Zinkann
    ANL, Argonne, USA
 
  Funding: This work was supported by the U.S. Department of Energy, Office of Nuclear Physics, under Contract DE-AC02-06CH11357.
An Electron Beam Ion Source Charge Breeder (EBIS-CB) has been developed at Argonne to breed radioactive beams from the CAlifornium Rare Ion Breeder Upgrade (CARIBU) facility at ATLAS. The CARIBU EBIS-CB has been successfully commissioned offline with an external singly-charged cesium ion source. The EBIS performance meets the breeding requirements to deliver CARIBU beams to ATLAS. EBIS can provide charge-to-mass ratios >=1/7 for all CARIBU beams with breeding times in the range of 6 ms to 30 ms. A record high breeding efficiency of up to 28% into a single charge state of Cs28+ has been demonstrated. Following the offline testing EBIS was moved to the front end of ATLAS where the alignment of EBIS was substantially improved and additional beam diagnostic tools both for electron and ion beams were installed. This paper will discuss EBIS improvements and present the results of on-line commissioning.
 
slides icon Slides FR1A02 [7.717 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-FR1A02  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)