Commissioning and Plans at IOTA/FAST  
 
  • D.R. Broemmelsiek, C.M. Baffes, C.I. Briegel, K. Carlson, B.E. Chase, D.J. Crawford, E. Cullerton, J.S. Diamond, N. Eddy, D.R. Edstrom, E.R. Harms, J.R. Leibfritz, A.H. Lumpkin, E. Prebys, J. Reid, J. Ruan, T. Sen, V.D. Shiltsev, G. Stancari, J.C.T. Thangaraj, R.M. Thurman-Keup, A. Valishev, A. Warner
    Fermilab, Batavia, Illinois, USA
  • A. Halavanau, D. Mihalcea, P. Piot
    Northern Illinois University, DeKalb, Illinois, USA
  • J. Hyun
    Sokendai, Ibaraki, Japan
  • P. Kobak
    BYU-I, Rexburg, USA
  • W.D. Rush
    KU, Lawrence, Kansas, USA
 
  The electron injector at IOTA/FAST is based on a 50MeV RF photoinjector and SRF 1.3 GHz cryomodule to accelerate beam up to 300 MeV. Photoinjector and Cryomodule (CM2) were commissioned separately. CM2 demonstrated world record accelerating gradient > 30MV/m in all cavities. Commissioning of the 50MeV RF photoinjector was successfully done recently. Results of commissioning, status and plans for IOTA/FAST are presented.  
slides icon Slides MO2A02 [6.248 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPLR022 Commissioning and First Results from the Fermilab Cryomodule Test Stand 185
 
  • E.R. Harms, M.H. Awida, C.M. Baffes, K. Carlson, S.K. Chandrasekaran, B.E. Chase, E. Cullerton, J.P. Edelen, J. Einstein, C.M. Ginsburg, A. Grassellino, B.J. Hansen, J.P. Holzbauer, S. Kazakov, T.N. Khabiboulline, M.J. Kucera, J.R. Leibfritz, A. Lunin, D. McDowell, M.W. McGee, D.J. Nicklaus, D.F. Orris, J.P. Ozelis, J.F. Patrick, T.B. Petersen, Y.M. Pischalnikov, P.S. Prieto, O.V. Prokofiev, J. Reid, W. Schappert, D.A. Sergatskov, N. Solyak, R.P. Stanek, D. Sun, M.J. White, C. Worel, G. Wu
    Fermilab, Batavia, Illinois, USA
 
  Funding: Operated by Fermi Research Alliance, LLC under Contract No. De-AC02-07CH11359 with the United States Department of Energy.
A new test stand dedicated to SRF cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overview of first test results, and survey future plans.
 
poster icon Poster MOPLR022 [3.431 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-MOPLR022  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPLR065 Beam Commissioning Status and Results of the FNAL PIP2IT Linear Accelerator RFQ 1002
 
  • J. Steimel, C.M. Baffes, P. Berrutti, J.-P. Carneiro, J.P. Edelen, T.N. Khabiboulline, L.R. Prost, V.E. Scarpine, A.V. Shemyakin
    Fermilab, Batavia, Illinois, USA
  • A.L. Edelen
    CSU, Fort Collins, Colorado, USA
  • M.D. Hoff, A.R. Lambert, D. Li, T.H. Luo, J.W. Staples, S.P. Virostek
    LBNL, Berkeley, California, USA
  • V.L. Sista
    BARC, Mumbai, India
 
  Funding: Operated by Fermi Research Alliance, LLC under Contract No. De-AC02-07CH11359 with the United States Department of Energy.
An H beam was accelerated through a continuous wave (CW) capable, 4-vane, radio frequency quadrupole (RFQ) at Fermilab that was designed and constructed at Berkeley Lab. This RFQ is designed to accelerate up to 10 mA H beam from 30 keV to 2.1 MeV in a test accelerator (PIP2IT). This paper presents results of specification verification and commissioning.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-THPLR065  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)