The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.
TY - CONF AU - Militsyn, B.L. AU - Angal-Kalinin, D. AU - Buckley, R.K. AU - Burt, G. AU - Cash, R.J. AU - Clarke, J.A. AU - Cowie, L.S. AU - Fell, B.D. AU - Goudket, P. AU - Jones, T.J. AU - Marinov, K.B. AU - McIntosh, P.A. AU - McKenzie, J.W. AU - Middleman, K.J. AU - Noakes, T.C.Q. AU - Paramonov, V.V. AU - Shepherd, B.J.A. AU - Valizadeh, R. AU - Wheelhouse, A.E. ED - Yamazaki, Yoshishige ED - Facco, Alberto ED - McCausey, Amy ED - Schaa, Volker RW TI - Status of the Injection System of the CLARA FEL Test Facility J2 - Proc. of LINAC2016, East Lansing, MI, USA, 25-30 September 2016 C1 - East Lansing, MI, USA T2 - Linear Accelerator Conference T3 - 28 LA - english AB - The 250 MeV CLARA FEL test facility is now under construction at Daresbury Laboratory. Electron beam for this facility is provided by two normal conducting S-band photocathode guns: a 10 Hz 2.5 cell gun earlier used as the injector for the VELA machine, and a 400 Hz 1.5 cell gun now under commissioning. At the initial stage of Phase I CLARA will operate with the 10 Hz gun and a 45 MeV 2 m long linac section working as a buncher and/or booster. The beam will be deflected into the existing VELA beamline with an S-bend and directed to the spectrometer line for analysing beam properties or into one of two VELA user areas. The 400 Hz gun will be installed in the VELA beamline for detailed high power RF and beam commissioning in the VELA beam diagnostics suite. As the 400 Hz gun is equipped with an interchangeable photocathode it is possible to investigate different metal photocathodes and select the one providing minimal beam emittance at highest quantum efficiency. A state of the art photocathode preparation system is under commissioning at Daresbury. After commissioning the 400 Hz gun will be installed to the CLARA beam line to deliver high energy, high repetition rate beams for the FEL facility, and the 10 Hz gun will be returned to the VELA beam line. PB - JACoW CP - Geneva, Switzerland SP - 174 EP - 177 KW - gun KW - cavity KW - FEL KW - solenoid KW - cathode DA - 2017/05 PY - 2017 SN - 978-3-95450-169-4 DO - 10.18429/JACoW-LINAC2016-MOPLR016 UR - http://jacow.org/linac2016/papers/moplr016.pdf ER -