Author: Wang, S.
Paper Title Page
TUIOB04 DTL Construction Status of CSNS Project 423
 
  • H.C. Liu, S. Fu, J. Peng, S. Wang
    IHEP, Beijing, People's Republic of China
 
  Linac of Chinese Spallation Neutron Source (CSNS) project is under construction. The ion source is tested and good performance of beam current is obtained. The low level RF tuning is underway of the RFQ and assembling of DTL will start soon. Not only the construction of hardware, but some commissioning software packages have been developed and tested.  
slides icon Slides TUIOB04 [4.772 MB]