|
- A.G. Tribendis, Y.A. Biryuchevsky, E. Kendjebulatov, Ya.G. Kruchkov, E. Rotov, A.A. Zhukov
BINP SB RAS, Novosibirsk, Russia
- Y. Cuvet, A. Dallocchio, J.-F. Fuchs, F. Gerigk, J.-M. Giguet, J. Hansen, T. Muranaka, E. Page, B. Riffaud, N. Thaus, M. Tortrat, M. Vretenar, R. Wegner
CERN, Geneva, Switzerland
- M.Y. Naumenko
RFNC-VNIITF, Snezhinsk, Chelyabinsk region, Russia
|
|
|
This paper reports on the construction experience of the Linac4 CCDTL, which took place in two Russian institutes in the framework of three ISTC projects in close collaboration with CERN. The tanks were constructed at VNIITF, Snezhinsk, while the drift tubes and supports were made at BINP, Novosibirsk. All structures were then assembled and tuned at BINP before shipment to CERN where the high-power conditioning took place. The tuning principles, quality checks and conditioning results are presented.
|
|