THIOA03 Status of the HIE-ISOLDE Linac 795
 
  • W. Venturini Delsolaro, L. Alberty, L. Arnaudon, K. Artoos, J. Bauche, A.P. Bernardes, J.A. Bousquet, E. Bravin, S. Calatroni, E.D. Cantero, O. Capatina, N. Delruelle, D. Duarte Ramos, M. Elias, F. Formenti, M.A. Fraser, J. Gayde, S. Giron, N.M. Jecklin, Y. Kadi, G. Kautzmann, Y. Leclercq, P. Maesen, V. Mertens, E. Montesinos, V. Parma, G.J. Rosaz, K.M. Schirm, E. Siesling, D. Smekens, A. Sublet, M. Therasse, D. Valuch, G. Vandoni, E. Vergara Fernandez, D. Voulot, L.R. Williams, P. Zhang
    CERN, Geneva, Switzerland
 
  The HIE-ISOLDE project aims at increasing the energy of the radioactive beams (RIB) of REX-ISOLDE from the present 3 MeV/u up to 10 MeV/u for A/q up to 4.5. This will be accomplished by means of a new superconducting linac, based on independently phased quarter wave resonators using the Nb sputtering on copper technology, and working at 101.28 MHz. The focusing elements are superconducting solenoids providing 13.5 T2m field integral. These active elements are contained in a common vacuum cryostat. The presentation will cover the status of advancement of the HIE-ISOLDE linac technical systems. The performance of the superconducting elements will be presented, together with the assembly work of the cryomodule in clean room and the planned qualification tests in the horizontal test facility at CERN  
slides icon Slides THIOA03 [24.692 MB]  
 
THPP131 Series Superconducting Cavity Production for the HIE-ISOLDE Project at CERN 1165
 
  • M. Therasse, L. Alberty, K. Artoos, S. Calatroni, O. Capatina, A. D'Elia, N.M. Jecklin, Y. Kadi, I. Mondino, K.M. Schirm, A. Sublet, W. Venturini Delsolaro, P. Zhang
    CERN, Geneva, Switzerland
 
  In the context of the HIE-ISOLDE linac upgrade at CERN, the phase 1 planned to boost the energy of the machine from 3 MeV/u to 5 MeV/u. For this purpose, it is planned to install 2 cryomodules based on quarter waves resonators (QWRs) made by Niobium sputtering on Copper. The poster will present the different steps of the cavity series production since the reception from the industry to the cavity storage before cryomodule assembly. We will describe the cavity preparation included the resonance frequency measurement, the chemical treatment, the cavity rinsing, the Niobium coating and the RF test at 4.5K.