Paper |
Title |
Page |
TUPP029 |
Diagnostics and Analysis Techniques for High Power X-Band Accelerating Structures |
490 |
SUPG002 |
|
|
- A. Degiovanni, S. Döbert, W. Farabolini, I. Syratchev, W. Wuensch
CERN, Geneva, Switzerland
- J. Giner Navarro
IFIC, Valencia, Spain
- J. Tagg
National Instruments Switzerland, Ennetbaden, Switzerland
- B.J. Woolley
Cockcroft Institute, Lancaster University, Lancaster, United Kingdom
|
|
|
The study of high gradient limitations due to RF breakdowns is extremely important for the CLIC project. A series of diagnostic tools and analysis techniques have been developed in order to monitor and characterize the behaviour of CLIC accelerating structures under high power operation in the first CERN X-band klystron-based test stand (Xbox1). The data collected during the last run on a TD26r05 structure are presented in this paper. From the analysis of the RF power and phases, the location of the breakdowns inside the structure could be determined. Other techniques based on the field emitted dark current signals collected by Faraday cups placed at the two extremities of the structure have also been investigated. The results of these analyses are reported and discussed.
|
|
|
TUPP033 |
Effect of Beam-Loading on the Breakdown Rate of High Gradient Accelerating Structures |
499 |
TUPOL08 |
|
|
- J.L. Navarro Quirante, R. Corsini, A. Degiovanni, S. Döbert, A. Grudiev, O. Kononenko, G. McMonagle, S.F. Rey, A. Solodko, I. Syratchev, F. Tecker, L. Timeo, B.J. Woolley, X.W. Wu, W. Wuensch
CERN, Geneva, Switzerland
- O. Kononenko
SLAC, Menlo Park, California, USA
- A. Solodko
JINR, Dubna, Moscow Region, Russia
- J. Tagg
National Instruments Switzerland, Ennetbaden, Switzerland
- B.J. Woolley
Cockcroft Institute, Lancaster University, Lancaster, United Kingdom
- X.W. Wu
TUB, Beijing, People's Republic of China
|
|
|
The Compact Linear Collider (CLIC) is a study for a future room temperature electron-positron collider with a maximum center-of-mass energy of 3 TeV. To efficiently achieve such high energy, the project relies on a novel two beam acceleration concept and on high-gradient accelerating structures working at 100 MV/m. In order to meet the luminosity requirements, the break-down rate in these high-field structures has to be kept below 10 per billion. Such gradients and breakdown rates have been demonstrated by high-power RF testing several 12 GHz structures. However, the presence of beam-loading modifies the field distribution for the structure, such that a higher input power is needed in order to achieve the same accelerating gradient as the unloaded case. The potential impact on the break-down rate was never measured before. In this paper we present an experiment located at the CLIC Test Facility CTF3 recently proposed in order to quantify this effect, layout and hardware status, and discuss its first results.
|
|
|
Slides TUPP033 [1.970 MB]
|
|
|
Poster TUPP033 [2.355 MB]
|
|
|