Author: Seidman, D.J.
Paper Title Page
THPP133 LLRF System for the CEBAF Separator Upgrade 1171
 
  • T. E. Plawski, R. Bachimanchi, C. Hovater, D.J. Seidman, M.J. Wissmann
    JLab, Newport News, Virginia, USA
 
  The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of four new 750 MHz deflecting, normal conducting cavities in the 5th pass extraction region. This system will work together with existing 499 MHz RF Separator in order to allow simultaneous delivery of the beam to four CEBAF experimental halls. The RF system employs two digital LLRF systems controlling four cavities in a vector sum. Cavity tune information of the individual cavities is also obtained using a multiplexing scheme of the forward and reflected RF signals. In this paper we will present detailed LLRF design and current status of the CEBAF 750 MHz beam extraction system.