We installed Annular-type Coupled Structure (ACS) linac in year 2013 in present linac downstream to extend the beam energy from 181 to 400 MeV. The beam commissioning had been conducted for one month in last December to January, and then we successfully extract 400 MeV beam. Whereas, we stably operate the linac at peak current of 15 mA, which is equivalent to 300 kW at the extraction of 3 GeV RCS, we observe unexpected residual radiations in ACS section. In this presentation, we review the recent progress in beam commissioning and beam loss study.
|
|