Author: Pronitchev, O.V.
Paper Title Page
MOPP046 On the Design of Higher Order Mode Antenna for LCLS II 161
 
  • M.H. Awida, I.V. Gonin, T.N. Khabiboulline, K.S. Premo, O.V. Pronitchev, N. Solyak, V.P. Yakovlev
    Fermilab, Batavia, Illinois, USA
 
  Funding: Operated by Fermi Research Alliance, LLC, under Contract DE-AC02-07CH11359 with the U.S. DOE
The upgrade of the Linac Coherent Light Source (LCLS-II) necessitates a major modification to the higher order mode (HOM) antenna of the conventional ILC elliptical 9-cell cavity. Due to the continuous wave nature of the proposed LCLS II Linac, the HOM antenna is required to bare higher RF losses. A modified design of the HOM antenna is presented in this paper ahead with a thorough thermal quench study in comparison with the conventional ILC design.
 
 
TUPP049 Test Stand for 325 MHz Power Couplers 538
 
  • S. Kazakov, B.M. Hanna, T.N. Khabiboulline, V. Poloubotko, O.V. Pronitchev, V.P. Yakovlev
    Fermilab, Batavia, Illinois, USA
 
  325 MHz superconducting Single Spoke resonators (SSR1) will be utilized in the Project X Injector Experiment (PXIE). Developed in Fermilab the main power coupler will be supply 2kW CW RF power to each cavity. Fermilab developed and designed the special test stand where the couplers will be tested up to 10 kW and design properties be confirmed. This paper describes the design of the coupler test stand and preliminary results of the tests.  
 
THPP049 Design of 162.5 MHz CW Main Coupler for RFQ 960
 
  • S. Kazakov, T.N. Khabiboulline, V. Poloubotko, O.V. Pronitchev, J. Steimel, V.P. Yakovlev
    Fermilab, Batavia, Illinois, USA
 
  Project X Injector Experiment (PXIE) at Fermilab will utilize 162.5 MHz CW RFQ accelerating cavity. Design of new main power coupler for PXIE RFQ is reported. Two identical couplers are supposed to deliver approximately 100 kW total CW RF power to RFQ. Unique design of the coupler allows providing DC bias for multipactor suppression. Results of RF and thermal simulations along with mechanical design are presented.  
 
THPP050 Status of 325 MHz Main Couplers for PXIE 963
 
  • S. Kazakov, B.M. Hanna, T.N. Khabiboulline, V. Poloubotko, O.V. Pronitchev, L. Ristori, V.P. Yakovlev
    Fermilab, Batavia, Illinois, USA
 
  The Project X Injector Experiment (PXIE) at Fermilab will include one cryomodule with eight 325 MHz single spoke superconductive cavities (SSR1). Each cavity requires approximately 2 kW CW RF power for 1 mA beam current operation. A future upgrade will require up to 8 kW RF power per cavity. Fermilab has designed, procured and tested two prototype couplers for the SSR type cavities. Status of the 325 MHz main coupler development for PXIE is reported.