- H. Ao, T. Ito, Y. Nemoto, H. Oguri, N. Ouchi, J. Tamura
JAEA/J-PARC, Tokai-mura, Japan
- H. Asano
Nippon Advanced Technology Co. Ltd., Ibaraki-prefecture, Japan
- Z. Fang, K. Futatsukawa, K. Nanmo, T. Sugimura
KEK, Ibaraki, Japan
|
|
|
The linac of Japan Proton Accelerator Research Complex (J-PARC), which is an injector to a 3-GeV synchrotron, comprised a 3-MeV RFQ, 50-MeV DTLs and 181-MeV Separated-type DTLs. From September 2013, 25 annular-ring coupled structure (ACS) cavities were additionally installed to increase the linac beam energy up to 400 MeV and achieve 1-MW beam power of the 3-GeV synchrotron. After installation work the high power conditioning was started from December 2013 and most of the ACS cavities were conditioned within three weeks. We passed through some troubles and finally finished conditioning all the cavities until the middle of January 2014. In this paper, we present the conditioning results and how to handle the issue in the conditioning process.
|
|