Paper | Title | Page |
---|---|---|
MOPP046 | On the Design of Higher Order Mode Antenna for LCLS II | 161 |
|
||
Funding: Operated by Fermi Research Alliance, LLC, under Contract DE-AC02-07CH11359 with the U.S. DOE The upgrade of the Linac Coherent Light Source (LCLS-II) necessitates a major modification to the higher order mode (HOM) antenna of the conventional ILC elliptical 9-cell cavity. Due to the continuous wave nature of the proposed LCLS II Linac, the HOM antenna is required to bare higher RF losses. A modified design of the HOM antenna is presented in this paper ahead with a thorough thermal quench study in comparison with the conventional ILC design. |
||
MOPP049 | Dipole Kick due to Geometry Asymmetries in HWR for PXIE | 165 |
|
||
Funding: Work supported by D.O.E. Contract No. DE-AC02-07CH11359 Project X Injector Experiment (PXIE) will have a family of half wave resonators having frequency=162.5 MHz and beta optimal=0.11. During cavity production, when the niobium parts are assembled and welded together, it is fundamental to control the frequency of the accelerating mode in order to meet the specified operating value. For the HWR of PXIE the tuning will be achieved by trimming one end of the resonator only, this will introduce unwanted asymmetry in the cavity geometry leading to a dipole kick for the particles traveling through the cavity. The cavity geometry will be different from the ideal, once the cavity is assembled, because of small misalignment of the niobium parts and because of the welding shrinkage. Misalignments of the inner conductor and the beam pipes can be expected. The asymmetry due to tuning process along with production misalignments, have been simulated and the equivalent dipole kick has been calculated. |
||
![]() |
Poster MOPP049 [1.441 MB] | |
MOPP052 | Development of 5-Cell β=0.9 650 MHz Elliptical Cavities for Project X | 171 |
|
||
Several 5-cell 650 MHz elliptical cavities have been fabricated for the PIP-II Project. Two versions of the cavities have been designed to accelerate protons of relative group velocity of β=0.9 and β=0.92 in the high energy region of the linac. In this paper, we report the development status of these cavities, summarize the results of the quality control measurements performed on five initial prototypes, and outline the VTS test results. | ||
MOPP053 | TTF-III Coupler Modification for CW Operation | 174 |
|
||
LCLS-II linac is based on XFEL/ILC superconducting technology, but CW regime of operation requires the modification of components to satisfy LCLS-II requirements. TTF-III coupler is considered as a candidate for a fundamental power coupler for the 1.3 GHz 9-cell accelerating structure at the LCLS-II project. In this paper we discuss the results of multiphysics analysis of the coupler working at various operating regimes. Two major modifications are proposed in order to meet the LCLS-II requirements and eliminate possible overheating: reducing the length of antenna (cold part) and increasing the thickness of a cooper plating on the inner conductor of the warm part of the coupler. | ||
TUPP047 | PXIE RFQ Bead Pull Measurements | 535 |
|
||
Funding: Work supported by D.O.E. Contract No. DE-AC02-07CH11359 Project X Injector Experiment radio frequency quadrupole has recently been built for Fermilab by Berkley laboratory. This RFQ will be placed after the low energy beam transport (LEBT) and before the medium energy beam transport (MEBT). The RFQ will operate at 162.5 MHz in CW regime; its function is to accelerate and focus particles coming from the LEBT at 30 keV, and to deliver a beam at 2.1 MeV to the MEBT. In order to make sure that the RFQ meets the specifications of field flatness and frequency the field in the vanes should be measured using bead pull technique. FNAL created a new single wire bead pull set up for the RFQ of PXIE. The measurements are used to find the electrical center of the structure, then the amplitude of the electromagnetic field in all the sectors of the RFQ; and the tuning will be based on these measurements. This paper describes the bead pull experimental set up, the software developed for this particular application and the measurements taken. |
||
![]() |
Poster TUPP047 [1.089 MB] | |
TUPP049 | Test Stand for 325 MHz Power Couplers | 538 |
|
||
325 MHz superconducting Single Spoke resonators (SSR1) will be utilized in the Project X Injector Experiment (PXIE). Developed in Fermilab the main power coupler will be supply 2kW CW RF power to each cavity. Fermilab developed and designed the special test stand where the couplers will be tested up to 10 kW and design properties be confirmed. This paper describes the design of the coupler test stand and preliminary results of the tests. | ||
THPP048 | Design of a Compact Lever Slow/Fast Tuner for 650 MHz Cavities for Project X | 957 |
|
||
Fermilab is developing 5-cell elliptical 650 MHz β=0.6 and β=0.9 cavities for Project X. A compact fast/slow lever tuner intended for both types of cavities has been developed for final tuning of the resonance frequency of the cavity after cooling down and to compensate the resonance frequency variations of the cavity during operation coming from liquid helium pressure fluctuations. The updated helium vessel (presented at this conference) is equipped with the tuner located at one of the end of the cavity. The tuner design and results of ANSYS analysis of their properties are presented. | ||
THPP049 | Design of 162.5 MHz CW Main Coupler for RFQ | 960 |
|
||
Project X Injector Experiment (PXIE) at Fermilab will utilize 162.5 MHz CW RFQ accelerating cavity. Design of new main power coupler for PXIE RFQ is reported. Two identical couplers are supposed to deliver approximately 100 kW total CW RF power to RFQ. Unique design of the coupler allows providing DC bias for multipactor suppression. Results of RF and thermal simulations along with mechanical design are presented. | ||
THPP050 | Status of 325 MHz Main Couplers for PXIE | 963 |
|
||
The Project X Injector Experiment (PXIE) at Fermilab will include one cryomodule with eight 325 MHz single spoke superconductive cavities (SSR1). Each cavity requires approximately 2 kW CW RF power for 1 mA beam current operation. A future upgrade will require up to 8 kW RF power per cavity. Fermilab has designed, procured and tested two prototype couplers for the SSR type cavities. Status of the 325 MHz main coupler development for PXIE is reported. | ||
THPP051 | Design of a Quasi-Waveguide Multicell Deflecting Cavity for the Advanced Photon Source | 966 |
|
||
This paper reports the electromagnetic design of a 2815 MHz Quasi-waveguide Multicell Resonator (called QMiR) being considered as a transverse RF deflecting cavity for the Advanced Photon Source’s (APS) Short Pulse X-ray project. QMiR forms a trapped dipole mode inside a beam vacuum chamber while High Order Modes (HOM) are heavily loaded. It results a sparse HOM spectrum, makes HOM couplers unnecessary and allows to simplify the cavity mechanical design. The form of electrodes is optimized for producing 2 MV of deflecting voltage and keeping low peak surface electric and magnetic fields of 54 MV/m and 75 mT respectively. Results of detailed EM analysis, including HOM damping at the actual geometry of beam vacuum chamber, will be presented. | ||
![]() |
Poster THPP051 [1.250 MB] | |
THPP057 | Results of Cold Tests of the Fermilab SSR1 Cavities | 979 |
|
||
Fermilab is currently building the Project X Injector experiment (PXIE). The PXIE linac will accelerate a 1 mA H− beam up to 30 MeV and serve as a testbed for validation of Project X concepts and mitigation of technical risks. A cryomodule of eight superconducting RF Single Spoke Resonators of type 1 (SSR1) cavities operating at 325 MHz is an integral part of PXIE. Ten SSR1 cavities were manufactured in industry and delivered to Fermilab. We discuss tests of nine bare SSR1 cavities at the Fermilab Vertical Test Stand (VTS). Recently, one of the SSR1 cavities was welded inside a helium jacket. Results of the test of this cavity in the Fermilab Spoke Test Cryostat (STC) are shown. We report on the measured performance parameters of SSR1 cavities achieved during the tests. | ||