Paper | Title | Page |
---|---|---|
MOPP082 | Superconducting Linac for RISP | 245 |
|
||
The RISP (Rare Isotope Science Project) has been proposed as a multi-purpose accelerator facility for providing beams of exotic rare isotopes of various energies. It can deliver ions from proton to Uranium. Proton and Uranium beams are accelerated upto 600 MeV and 200 MeV/u respectively. The facility consists of three superconducting linacs of which superconducting cavities are independently phased. Requirement of the linac design is especially high for acceleration of multiple charge beams. In this paper, we present the RISP linac design, the prototyping of superconducting cavity and cryomodule. | ||
TUPP083 | Design and Analysis of Slow Tuner in the Superconducting Cavity of RISP | 616 |
|
||
Funding: This work was supported by the Rare Isotope Science Project of Institute of Basic Science funded by the Ministry of Science, ICT and Future Planning and National Research Foundation. Superconducting cavity is one of the most complex systems from the view of mechanical engineering, which is installed and operated in the superconducting linear accelerator. In order to operate SC cavity properly and precisely, superconducting cavity needs many sub-systems, including power coupler for applying RF power inside cavity, and liquid helium jacket for cooling cavity until reaching to the superconducting conditions. And, also cavity needs frequency tuning system for adjusting operating frequency when RF frequency of cavity is changed with outer disturbances such as liquid helium fluctuation, mechanical deformation due to vacuum condition of cavity. Generally, this tuning system is called as a tuner. There are two types of tuner, one is slow tuner which operates with motor, and the other is fast tuner which operates with piezo-electric actuator. This paper describes about design process and analysis results about slow tuner. |
||
THPP079 | Prototyping Progress of SSR1 Single Spoke Resonator for RAON | 1 |
|
||
The fabrication of prototypes for four different types of superconducting cavities (QWR, HWR, SSR1, and SSR2) for the Korean heavy ion accelerator, “RAON” is in progress. In this presentation, we report the current status of the SSR1 cavity (β=0.3 and f=325 MHz) prototype fabrication based on the technical designs. The issues when forming the niobium cavities such as pressing, machining, electron beam welding are reviewed. The RF testing for the prototypes, which will be done in near future, is also discussed. | ||