Author: Jo, Y.W.
Paper Title Page
TUPP086 RAON Superconducting Radio Frequency Test Facility Construction 625
 
  • H. Kim, D. Jeon, Y.W. Jo, Y. Jung, S.A. Kim, W.K. Kim, S.J. Lee, S.W. Nam, G.-T. Park, J.H. Shin
    IBS, Daejeon, Republic of Korea
 
  Superconducting Radio Frequency (SRF) test facility for RAON is under construction process. It consists of cryogenic system, clean room for cavity process and assembles vertical test, horizontal test, and the radiation shield. The cryoplant has 330 W (4.5 K equivalent) which supplies 4.5K supercritical helium to the cavity test and cryomodule test bench. Clean rooms are for cavity process and assemble whose class is from 10 to 10000. The layout for the vertical and horizontal test bench is shown and the radiation shield for the test bench is shown to reduce X-ray coming from cavity. To estimate the thickness of concrete, radiation simulation is performed.