THPP021 | Analysis of the RF Test Results from the On-going Accelerator Cavity Production for the European XFEL | 879 |
|
||
Funding: The research leading to these results has received funding from the European Union Seventh Framework Programme (FP7/2007-2013) under grant agreement no 283745 (CRISP) The main Linac of the European XFEL will consist of 100 superconducting accelerator modules, operated at an average design gradient of 23.6 MV/m. The fabrication by industry (which includes chemical surface preparation) of the required 800 superconducting cavities is now in full swing, with approximately 400 cavities having been delivered to date. In this interim report, we present an analysis of the RF acceptance tests amassed so far. |
||