Author: Fischer, R.L.
Paper Title Page
MOPP001 First Experimental Results for the Superconducting Half-Wave Resonators for PXIE 46
 
  • Z.A. Conway, A. Barcikowski, G.L. Cherry, R.L. Fischer, S.M. Gerbick, M. Kedzie, M.P. Kelly, S.H. Kim, S.W.T. MacDonald, R.C. Murphy, P.N. Ostroumov, T. Reid, K.W. Shepard
    ANL, Argonne, USA
 
  Funding: This work was supported by the U.S. Department of energy, Offices of High-Energy Physics and Nuclear Physics, under Contract No. DE-AC02-76-CH03000 and DE-AC02-06CH11357.
The first pair of superconducting niobium half-wave resonators operating at 162.5 MHz for the FNAL PIP-II project are complete and this poster reports the cold test results. These cavities are optimized to accelerate protons/H from 2 to 10 MeV and build upon optimized electromagnetic designs and processing techniques developed at Argonne for the Intensity Upgrade of the ATLAS superconducting heavy ion accelerator.
 
 
TUPP001 Cryogenic Performance of a New 72 MHz Quarter-Wave Resonator Cryomodule 437
 
  • Z.A. Conway, G.L. Cherry, R.L. Fischer, S.M. Gerbick, M. Kedzie, M.P. Kelly, S.H. Kim, S.W.T. MacDonald, R.C. Murphy, P.N. Ostroumov, C.E. Peters, M.A. Power, T. Reid, J.R. Specht
    ANL, Argonne, USA
 
  Funding: This material is based upon work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics, under contract number DE-AC02-06CH11357.
The Argonne National Laboratory ATLAS accelerator’s Intensity and Efficiency Upgrade project has been successfully finished [1]. This upgrade substantially increases beam currents for experimenters working with the existing stable and in-flight rare isotope beams and for the neutron rich beams from the Californium Rare Isotope Breeder upgrade. A major portion of this project involved the replacement of three existing cryomodules, containing 18 superconducting (SC) accelerator cavities and 9 superconducting solenoids, with a single cryomodule containing 7 SC 72.75 MHz accelerator cavities optimized for ion velocities of 7.7% the speed of light and 4 SC solenoids all operating at 4.5 K. This paper reports the measured thermal load to the 4 K and 80 K coolant streams and compares these results to the pre-upgrade cryogenic system.