Author: D'Elia, A.
Paper Title Page
THPP131 Series Superconducting Cavity Production for the HIE-ISOLDE Project at CERN 1165
 
  • M. Therasse, L. Alberty, K. Artoos, S. Calatroni, O. Capatina, A. D'Elia, N.M. Jecklin, Y. Kadi, I. Mondino, K.M. Schirm, A. Sublet, W. Venturini Delsolaro, P. Zhang
    CERN, Geneva, Switzerland
 
  In the context of the HIE-ISOLDE linac upgrade at CERN, the phase 1 planned to boost the energy of the machine from 3 MeV/u to 5 MeV/u. For this purpose, it is planned to install 2 cryomodules based on quarter waves resonators (QWRs) made by Niobium sputtering on Copper. The poster will present the different steps of the cavity series production since the reception from the industry to the cavity storage before cryomodule assembly. We will describe the cavity preparation included the resonance frequency measurement, the chemical treatment, the cavity rinsing, the Niobium coating and the RF test at 4.5K.