Author: Ciovati, G.
Paper Title Page
TUPP066 Commissioning Results of the 2nd 3.5 Cell SRF Gun for ELBE 578
 
  • A. Arnold, M. Freitag, P. Murcek, J. Teichert, H. Vennekate, R. Xiang
    HZDR, Dresden, Germany
  • G. Ciovati, P. Kneisel, L. Turlington
    JLab, Newport News, Virginia, USA
 
  As in 2007 the first 3.5 cell superconducting radio frequency (SRF) gun was taken into operation at the Helmholtz-Zentrum Dresden-Rossendorf (HZDR), it turned out that the specified performance to realize an electron energy gain of 9.4 MeV (Epk=50 MV/m @ Q0=1010) has not been achieved. Instead, the resonator of the gun was limited by field emission to about one third of these values and the measured beam parameters remained significantly behind the expectations. However, to demonstrate the full potential of this new electron source for the ELBE LINAC, a second and slightly modified SRF gun was developed and built in collaboration with Thomas Jefferson National Accelerator Facility (TJNAF). We will report on commissioning and first results of this new SRF gun. This includes in particular the characterization of the most important RF properties of the cavity as well as their comparison with previous vertical test results.  
poster icon Poster TUPP066 [1.220 MB]  
 
THPP072 BERLinPro Booster Cavity Design, Fabrication and Test Plans 1019
 
  • A. Burrill, W. Anders, A. Frahm, J. Knobloch, A. Neumann
    HZB, Berlin, Germany
  • G. Ciovati, P. Kneisel, L. Turlington
    JLab, Newport News, Virginia, USA
 
  The BERLinPro project, a 100 mA, 50 MeV superconducting RF (SRF) Energy Recovery Linac (ERL) is under construction at Helmholtz-Zentrum Berlin for the purpose of studying the technical challenges and physics of operating a high current, c.w., 1.3 GHz ERL. This machine will utilize three unique SRF cryomodules for the injector, booster and linac module respectively. The booster cryomodule will contain three 2-cell SRF cavities, based on the original design by Cornell University, and will be equipped with twin 115 kW RF power couplers in order to provide the appropriate acceleration to the high current electron beam. This paper will review the status of the fabrication of the 4 booster cavities that have been built for this project by Jefferson Laboratory and look at the challenges presented by the incorporation of fundamental power couplers capable of delivering 115 kW. The test plan for the cavities and couplers will be given along with a brief overview of the cryomodule design.