Author: Bustinduy, I.
Paper Title Page
MOPP039 Dynamics of Bunches Partially Chopped with the MEBT Chopper in the ESS Linac 146
 
  • R. Miyamoto, B. Cheymol, R. De Prisco, M. Eshraqi, A. Ponton, E. Sargsyan
    ESS, Lund, Sweden
  • I. Bustinduy
    ESS Bilbao, Bilbao, Spain
 
  The front-end of a hadron linac typically has a transient time during turning on and off and bunches in the head and tail of a pulse from this period likely have wrong parameters and a risk to cause beam losses. A risk of losses must be avoided as possible in a high power machine so these bunches are removed with deflectors called choppers in the ESS Linac. From experiences of other machines, a rise time of a chopper as fast as one RF period (2.84~ns for ESS) is challenging to achieve and not necessarily needed with no ring to inject like ESS, and hence a 10~ns rise time is planned for a chopper in the medium energy beam transport of ESS. This, however, means that several bunches receive intermediate deflections and may propagate with large trajectory excursions. This paper studies dynamics of such partially chopped bunches in detail to ensure no significant loss is caused by them.  
 
TUPP025 Progress on ESS Medium Energy Beam Transport 484
 
  • I. Bustinduy, D. Fernandez-Cañoto, N. Garmendia, A. Ghiglino, O. González, P.J. González, Z. Izaola, I. Madariaga, M. Magan, L. Muguira, J.L. Muñoz, I. Rueda, F. Sordo, S. Varnasseri, R. Vivanco
    ESS Bilbao, Bilbao, Spain
  • M. Eshraqi, R. Miyamoto, A. Ponton
    ESS, Lund, Sweden
 
  The considered versatile ESS MEBT is being designed to achieve four main goals: First, to contain a fast chopper and its correspondent beam dump, that could serve in the commissioning as well as in the ramp up phases. A detailed study of the chopper rise time effects on the loss budget will be presented. Second, to serve as a halo scraping section by means of various adjustable blades. Third, to measure the beam phase and profile between the RFQ and the DTL, along with other beam monitors. And finally, to match the RFQ output beam characteristics to the DTL input both transversally and longitudinally. For this purpose a set of eleven quadrupoles is used to match the beam characteristics transversally, combined with three 352.2 MHz CCL type buncher cavities, which are used to adjust the beam in order to fulfil the required longitudinal parameters. A thorough study on the optimal input beam parameters will be discussed. Quadrupole design update will be presented along with new RF measurements over the buncher prototype. Finally, updated results will be presented on the chopper and beam-dump system.  
poster icon Poster TUPP025 [5.596 MB]  
 
THPP025 RF Design and Low Power Measurements of a Nose-Cone Single Gap Buncher Cavity 888
 
  • O. González, I. Bustinduy, N. Garmendia, P.J. González, L. Muguira, J.L. Muñoz, A. Zugazaga
    ESS Bilbao, Bilbao, Spain
 
  A nose-cone single-gap buncher cavity for the Medium Energy Beam Transport (MEBT) has been fully designed, manufactured and measured under low-power conditions at ESS-Bilbao. The main steps of the design process are first reviewed. Second, the cavity is thoroughly measured and characterized by means of an automatic test procedure based on the bead-pull technique. Third, the simulated and measured results obtained for the main figures of merit are compared. Specifically, the results for the resonant frequency, the coupling and quality factors, the electric field profile, the R over Q ratio, the transit time factor and the tuning range are carefully analysed.  
 
THPP044 ESS Normal Conducting Linac Status and Plans 948
 
  • A. Ponton, B. Cheymol, R. De Prisco, M. Eshraqi, R. Miyamoto, E. Sargsyan
    ESS, Lund, Sweden
  • G. Bourdelle, M. Desmons, A. France, O. Piquet, B. Pottin
    CEA/DSM/IRFU, France
  • I. Bustinduy, P.J. González, J.L. Muñoz, I. Rueda, F. Sordo
    ESS Bilbao, Bilbao, Spain
  • L. Celona, S. Gammino, L. Neri
    INFN/LNS, Catania, Italy
  • M. Comunian, F. Grespan, A. Pisent, C. R. Roncolato
    INFN/LNL, Legnaro (PD), Italy
  • P. Mereu
    INFN-Torino, Torino, Italy
 
  The ESS Normal Conducting (NC) linac is composed of an ion source, a Low Energy Beam Transport line, a Radio Frequency Quarupole (RFQ), a Medium Energy Beam Transport Line (MEBT) and a Drift Tube Linac (DTL). It creates, bunches and accelerates the proton beam up to 90 MeV before injecting into the superconducting linac which will deliver a 5 MW beam onto the neutron production target. The construction of the NC linac is part of a broad collaboration involving experts of various Labs in Europe. The technical chalenges and the collaboration strategy for the NC linac will be presented.