Author: Burrill, A.
Paper Title Page
TUPP065 RF Input Power Couplers for High Current SRF Applications 575
TUPOL011   use link to see paper's listing under its alternate paper code  
 
  • V.F. Khan, W. Anders, A. Burrill, J. Knobloch, O. Kugeler, A. Neumann
    HZB, Berlin, Germany
  • H. Wang
    JLab, Newport News, Virginia, USA
 
  High current SRF technology is being explored in present day accelerator science. The BERLinPro project is presently being built at the HZB to address the challenges involved in high current SRF machines. A 100 mA electron beam is designed to be accelerated to 50 MeV in continuous wave (cw) mode at 1.3 GHz. One of the main challenges in this project is that of handling high input RF power for the gun as well as booster cavities where there is no energy recovery process. A high power co-axial input coupler is being developed to be used for the booster and gun cavities at the nominal beam current. The coupler is based on the KEK–cERL coupler design. The KEK coupler design has been modified to minimise the penetration of the tip in the beampipe without compromising on beam-power coupling ( Qext ~1 x 105). Herein we report on the RF design for the high power (130 kW) BERLinPro (BP) couplers along with the test stand for conditioning the couplers. We will also report on the RF conditioning of the TTF-III couplers modified for cw operation (low power ~ 10 kW) which will be utilised in a new 4-mA SRF Photoinjector and the BERLinPro main linac cryomodule.  
slides icon Slides TUPP065 [2.465 MB]  
 
THPP072 BERLinPro Booster Cavity Design, Fabrication and Test Plans 1019
 
  • A. Burrill, W. Anders, A. Frahm, J. Knobloch, A. Neumann
    HZB, Berlin, Germany
  • G. Ciovati, P. Kneisel, L. Turlington
    JLab, Newport News, Virginia, USA
 
  The BERLinPro project, a 100 mA, 50 MeV superconducting RF (SRF) Energy Recovery Linac (ERL) is under construction at Helmholtz-Zentrum Berlin for the purpose of studying the technical challenges and physics of operating a high current, c.w., 1.3 GHz ERL. This machine will utilize three unique SRF cryomodules for the injector, booster and linac module respectively. The booster cryomodule will contain three 2-cell SRF cavities, based on the original design by Cornell University, and will be equipped with twin 115 kW RF power couplers in order to provide the appropriate acceleration to the high current electron beam. This paper will review the status of the fabrication of the 4 booster cavities that have been built for this project by Jefferson Laboratory and look at the challenges presented by the incorporation of fundamental power couplers capable of delivering 115 kW. The test plan for the cavities and couplers will be given along with a brief overview of the cryomodule design.