Author: Arnaudon, L.
Paper Title Page
THIOA03 Status of the HIE-ISOLDE Linac 795
 
  • W. Venturini Delsolaro, L. Alberty, L. Arnaudon, K. Artoos, J. Bauche, A.P. Bernardes, J.A. Bousquet, E. Bravin, S. Calatroni, E.D. Cantero, O. Capatina, N. Delruelle, D. Duarte Ramos, M. Elias, F. Formenti, M.A. Fraser, J. Gayde, S. Giron, N.M. Jecklin, Y. Kadi, G. Kautzmann, Y. Leclercq, P. Maesen, V. Mertens, E. Montesinos, V. Parma, G.J. Rosaz, K.M. Schirm, E. Siesling, D. Smekens, A. Sublet, M. Therasse, D. Valuch, G. Vandoni, E. Vergara Fernandez, D. Voulot, L.R. Williams, P. Zhang
    CERN, Geneva, Switzerland
 
  The HIE-ISOLDE project aims at increasing the energy of the radioactive beams (RIB) of REX-ISOLDE from the present 3 MeV/u up to 10 MeV/u for A/q up to 4.5. This will be accomplished by means of a new superconducting linac, based on independently phased quarter wave resonators using the Nb sputtering on copper technology, and working at 101.28 MHz. The focusing elements are superconducting solenoids providing 13.5 T2m field integral. These active elements are contained in a common vacuum cryostat. The presentation will cover the status of advancement of the HIE-ISOLDE linac technical systems. The performance of the superconducting elements will be presented, together with the assembly work of the cryomodule in clean room and the planned qualification tests in the horizontal test facility at CERN  
slides icon Slides THIOA03 [24.692 MB]  
 
THPP037 Commissioning and Operational Experience Gained with the Linac4 RFQ at CERN 926
THPOL02   use link to see paper's listing under its alternate paper code  
 
  • C. Rossi, L. Arnaudon, P. Baudrenghien, G. Bellodi, O. Brunner, J. Hansen, J.-B. Lallement, A.M. Lombardi, J. Noirjean
    CERN, Geneva, Switzerland
  • M. Desmons, A. France, O. Piquet
    CEA/DSM/IRFU, France
 
  The installation of Linac4 has started in 2013 with the 3 MeV Front End, aiming at delivering a fully commissioned 160 MeV H beam by 2016. During summer 2013 the H ion source, a clone of the first prototype, and the Low Energy Beam Transport lines have been installed in the Linac4 tunnel followed shortly by the Radiofrequency Quadrupole accelerator (RFQ), operating at the RF frequency of 352.2 MHz and which accelerates the ion beam to the energy of 3 MeV. The RFQ, which had already been commissioned at the 3 MeV Test Stand, was this time driven by a fully digital LLRF system. This paper reports the result of the bead-pull field check performed after the installation in the tunnel, the experience gained during recommissioning and the results of field characterization as a function of the water temperature in the RFQ cooling channels, showing how the accelerating field can be adjusted by simply tuning the different cavity modules.